Control of Electrical Machines Lab Set Up (PCM-01S)

Description

  1. Perform breakdown test and determine the dielectric strength of transformer oil & Conduct acidity test on transformer oil.
  2. Conduct acidity test on transformer oil
  3. Test the timing characteristic of timing thermal Over load relay
  4. Write and test the control circuit for jogging in cage motor
  5. Write and test the control circuit for Semi automatic Star Delta Starter
  6. Write and test the control circuit for automatic Star Delta Starter
  7. Write and test the control circuit for dynamic breaking of cage motor
  8. Write and test the control circuit for two speed pole changing motor
  9. Write and test the control circuit for automatic Rotor resistance Starter
  10. Conduct test on Speed control of DC motor using SCR
  11. Test the working of Single phase preventer
  12. Wire and test the DOL Starter using PLC
  13. Wire and test the Star-Delta Starter using PLC
  14. Wire and test the control circuit for jogging, forward and reverse operations using PLC
  15. Wire and test the Single phase preventer using PLC
  16. Testing of 25KVA, 11KV/400V distribution transformer- Voltage test, Continuity test, Short  circuit test
  17. Dismantling and re – assembling of 25KVA, 11KV/400V distributing transformer
  18. Develop & execute the ladder logic diagram in PLC for 3 stage lift operation.
  19. Wire and test the sequential operation of solenoid valve and a motor for tank filling operation using PLC.
  20. Develop and execute the ladder logic to interface PLC with conveyor model for counting the object moving in the conveyer

For More Details & Spec , Contact : shanmugam@powerlabinstruments.com