Description
This trainer is designed to study the transmission line parameters (A,B,C,D) measurement procedure of a transmission line model .This set up consists of
- AC transmission Line Model
- Panel meter set up
AC transmission Line Model
- Two numbers of inductor with tapings & resistor with tapings is provided as Short Transmission Line model (40 Km)
- Two numbers of inductor with tapings & resistor with tapings & three numbers of fixed capacitor is provided as Long Transmission Line model (100 Km)-(For T & PI Network)
- Three numbers of inductor with tapings & resistor with tapings & four numbers of fixed capacitor is provided as Long Transmission Line model (200 Km)- (For T network)
- Necessary input and outputs are terminated by banana connectors for ac input
Meter set up
- One numbers of Digital AC Voltmeter is provided for sending end voltage (Vs) measurements
- One numbers of Digital AC ammeter is provided for sending end current (Is) measurements
- One numbers of Digital AC Voltmeter is provided for Receiving end voltage (Vr) measurements
- One numbers of Digital AC ammeter is provided for Receiving end current (Ir) measurements
- One number of Digital Phase Angel meter is provided to measure-
- Phase angle between Vs & Is /Phase angle between Vs & Vr/Phase angle between Vs & Ir/Load side Phase angle.
- One number 0-24V@2A ac source is provided for transmission line model input
For More Details , Contact : shanmugam@powerlabinstruments.com




